CHALLENGE Wildwood Ranch is a 2200 acre multi-land use development just west of Joplin, MO. TSE has provided numerous infrastructure designs for this development. One of the development’s needs is to provide sewer to un-sewered areas. SOLUTION An original Wastewater Collection System has been designed with an estimated cost of $800,000. There are also five additive alternates that consist of branches to serve various parts of the development. SPECIAL FEATURES • 8560 feet of 8" Pressure Sewer constructed within an existing electric utility easement • 400 linear feet horizontal directional boring under Shoal Creek • 3818 feet of 12" Gravity Sewer, and 1 Duplex Lift Station
Wastewater Treatment Plant, Pineville, MO
Wastewater Treatment Plant
This Block Grant funded project replaced an aging and undersized treatment plant with an oxidation ditch wastewater treatment plant. Designed to treat more than 124,000 gpd, the plant should handle the wastewater for Pineville’s projected needs for the next twenty years. Design includes an oxidation ditch, two clarifiers, ultraviolet disinfection, a bar screen, grit chamber and aerobic sludge digestion. TSE also completed periodic construction observation on this project, which was completed on time and on budget in February 2000.